Part P of the Building Regulations covers electrical safety in homes in England. All electrical work in a dwelling has to be carried out safely and meet the requirements, but only some jobs are notifiable, meaning they must be formally signed off. Knowing which is which helps you ask the right questions before work starts, and avoids awkward gaps when you come to sell.

What Part P applies to

Part P applies to fixed electrical installations in houses and flats, including gardens, garages, sheds and outbuildings connected to the home's supply. It does not cover plug-in appliances. The technical standard behind it is BS 7671, the IET Wiring Regulations.

Notifiable work in England

In England, three types of job are notifiable:

  • Installing a new consumer unit or fuse box
  • Installing a complete new circuit, such as a ring or radial for sockets, a lighting circuit, or a dedicated circuit for a cooker, electric shower or immersion heater
  • Altering or adding to an existing circuit in a special location, which in England means the space around a bath or shower

So a consumer unit upgrade, a rewire, a new shower circuit or extra lighting in the zones around a bath are all notifiable.

Work that is not notifiable

Most repairs, replacements and small additions outside special locations are not notifiable. Examples include:

  • Replacing a socket, switch or light fitting like for like
  • Adding a socket or light point to an existing circuit in a living room, bedroom or kitchen
  • Replacing a damaged cable for a single circuit on the same route

Kitchens and gardens are not special locations in England, which surprises people. In Wales the rules are different and kitchens and outdoor areas are treated as special locations.

Not notifiable does not mean anything goes. The work must still be safe and meet BS 7671, and a competent electrician will still test it and give you a Minor Electrical Installation Works Certificate.

How notifiable work is signed off

Through a competent person scheme

Electricians registered with a government approved competent person scheme can self-certify their own notifiable work. They tell the scheme, which notifies the local authority, and you receive a Building Regulations compliance certificate. This is the simplest route for most homeowners.

Through building control

If the installer is not registered, the work must be notified to a building control body before it starts. Building control then inspects and signs it off, usually for a fee. In England a registered third-party certifier can also be used.

Bathrooms and shower rooms

Because the space around a bath or shower is a special location, most bathroom electrical work is notifiable, including adding a light, an extractor fan or a shaver point in the zones around the bath or shower, and fitting a new electric shower circuit. BS 7671 also requires every circuit in a room containing a bath or shower to have 30mA RCD protection, and fittings in the zones must have a suitable IP rating for water. If you are planning a bathroom refit, involve the electrician early so cables can be run before tiling.

Extensions and loft conversions

Bigger building projects usually go through building control anyway. The electrical work still needs to be certified, either by a registered electrician who notifies it through their scheme or as part of the building control inspection, so agree with your builder who is responsible.

What to ask before work starts

  1. Is this job notifiable?
  2. If so, how will it be signed off: competent person scheme or building control?
  3. Which certificates will I receive, and when?
  4. Who pays any building control fee?

Any electrician should be able to answer these clearly. If the answer is that the paperwork is not needed for a new circuit or consumer unit, get a second opinion.

Paperwork to keep

  • Electrical Installation Certificate for new circuits, rewires and consumer units
  • Minor Electrical Installation Works Certificate for smaller additions and alterations
  • Building Regulations compliance certificate for notifiable work

Buyers' solicitors routinely ask for these, especially for newer consumer units and extensions. Missing paperwork can delay a sale, and the usual fix is an inspection and an EICR to show the condition of the installation.

Electrical work in Maidstone and Tonbridge

All our work is tested and certified to BS 7671, and we explain at the quote stage which jobs are notifiable and what paperwork you will receive. See our rewires, consumer units and domestic electrical service and our electrical testing and EICR service. We cover Maidstone, Tonbridge and surrounding villages. Call 01622 278762 to talk through your job.

Common questions

Is adding a socket notifiable under Part P?

Not in England, unless it is in the space around a bath or shower. It must still meet BS 7671 and should be certified.

Is replacing a consumer unit notifiable?

Yes. A new consumer unit is notifiable in England and needs a Building Regulations compliance certificate.

What if I have no certificates for past electrical work?

An EICR can show the current condition of the installation. Building control can also advise on regularising unauthorised work.