Fire Alarm Installation & Ongoing Maintenance
Madework Shop, London
When Madework Shop moved into new premises in London, OHMS GROUP LTD was appointed to rewire the three-storey building, providing enhanced fire alarm protection across each floor.
A Kentec fire alarm panel was installed with Hochiki devices throughout the building, with Linnol clips used to provide a neat and efficient method of installation.
Following completion of the installation, OHMS GROUP LTD has continued to provide ongoing maintenance and support for the building since 2023.
We pride ourselves on building strong, long-term relationships with our clients, and Madework Shop is a great example of how our installation work develops into a trusted ongoing maintenance partnership.
Scope of works
- Full rewire of the three-storey commercial building
- Kentec fire alarm control panel supplied, installed and commissioned
- Hochiki detection, sounders and manual call points across all three floors
- Fire alarm cabling clipped direct using Linnol clips for a neat, efficient finish
- New lighting and containment installed throughout the open-plan floors
- Ongoing planned maintenance and support provided since 2023
Kentec & Hochiki
Kentec panel with Hochiki protocol devices covering every floor of the building.
Neat first fix
Linnol clips used throughout for a tidy, efficient and consistent cable run.
Maintained since 2023
Ongoing servicing and support keeping the system compliant year after year.
Project photographs
Click any photograph to view it full size.
Planning a similar project?
OHMS GROUP LTD deliver fire alarm, security and electrical installations across Kent and UK-wide. Tell us about your site and we'll come back with a quote.
Request a quote

